Chapter 897 Power Test
"Xuanling, is there any news over Wuji?"
"Your Highness has passed two hours before the scheduled time. It should be about to have news and wait for a moment before we can find out."
Fang Xuanling didn't know what would happen, but he was still very confident in Changsun Wuji. After all, he could still make moves with Changsun Wuji's ability to do business.
There is nothing simple around Li Shimin, and everyone has their own expertise. For example, Changsun Wuji is considered a famous general under the Qin King's tent, but he is sincere in leading troops to fight. There is nothing better than trust.
But if you want to say that doing business is really a good person, at least they have relatively abundant funds when operating a shop in Penglai.
When the Qin Palace saw someone coming to Fang Xuanling, he saw that it was Changsun Wuji's guards immediately became the focus.
Fang Xuanling took the lead and whispered to the visitor for several words before drinking and then retreated.
"How is Xuanling's good things?"
"The matter has been completed. Changsun Wuji personally stared at the caravan thirty miles away and was on his way back."
Li Shimin is relieved now.
After Changsun Wuji came back, he came directly to the Qin Palace. He had to talk to Li Shimin about such a major event. With his understanding of Li Shimin, he had to go this trip.
If he didn't come, Li Shimin wouldn't be able to sleep today.
"Your Highness's things have been shipped out."
"Can you be sure of everything?" Li Shimin asked.
"Ensure that everything is foolproof." Changsun Wuji said.
The amount of goods transported is large and they do not pay attention to it.
A month and a half later, the merchant who transported coins from Youzhou sent the money to the place where Li Shimin was stationed in the army and then left Chang'an with a large amount of wood.
The inner courtyard of the Prince's Mansion is placed in several large boxes with copper coins and some silver coins. The lid is very visually impactful.
"Your Highness has calculated that there is 50,000 guan here." Zhang Su Wuji said.
"Wuji can collect the money and distribute the food and salary of the soldiers he had recruited before."
"yes."
The method Li Shimin adopted was to recruit soldiers first and wait for the money to arrive before paying it and then delaying for too long. Now that you have money, you must fulfill your previous promise.
In order to win people's hearts, some bonuses will be given to reward soldiers for training. After fulfilling their promise, they have received a good reputation.
Fang Xuanling and Du Ruhui took the opportunity to spread what Li Shimin did, although they could do a lot of work if they were to owe food and pay back first.
Li Shimin's approach was helpless and Li Yuan did not complain after learning about it. After all, it involved decent matters of the royal family. If the arrears of food and wages were spread, it would have an impact on the Li family.
But the fact is that Li Shimin did not have money to pay, and Li Yuan knew very well that he could not come out to teach his son a lesson at this time. After all, he would not spend his money on recruiting soldiers.
With soldiers, we still need soldiers and armor. Not to mention that the number of soldiers and armor is not enough to recruit soldiers, we are far from reaching the goals they set.
Two months later, hundreds of thousands of people in Youzhou joined the construction of the amusement park and park project. In total, the project was almost three months old. The prototype of the basic site had been planned to look roughly.
The foundations have been built, and the construction speed of the park projects is faster than that of the amusement parks is basically traditional construction plans, such as woods and lakes.
The construction of the amusement park requires very high foundation requirements, because every entertainment project in the amusement park needs to meet the city standards.
The latest rush to make a carousel in the Blacksmith Workshop, which uses ball bearing rotating braking, so as long as it has weight, it can easily move the carousel.
The power is still steam power.
The carousel shelf has been assembled in the amusement park and installed, and the carpenters have been decorated and portrayed various Trojans.
There is a large amount of wood piled up outside the park. These good wood are used to build park courtyards.
The planned villa group of the park's building area will be built as a high-end residential area in the future. In the future, it will become a relatively high-end residential area in Youzhou.
All the higher residential areas are invested by contractors, and collecting a large amount of wood is the businessman's idea.
Some of the remaining items used for building materials are sold to carpenters to earn the difference from them.
There are timber warehouses outside the park where there are piles of wood transported from Chang'an and they are inconspicuous, and there is too much wood in the warehouse.
The carousel frame on the playground has been installed, and coal has been put in the steam engine next to it, and the steam engine is starting.
"Wow, the carousel is turning."
Although the person responsible for installing the test could not see the final completion of the carousel, he saw that the rotation was only a shelf.
They need to go into the test, so the people responsible for the test are group members who work on the carousel frame every day.
In order to be able to test load bearing, not only people need to test, but also place heavy objects on it. The range of test includes many, including the wear degree of load bearing bearings.
It is very troublesome to replace this guy after installing it. The troublesome work is just to lift the frame discs to at least three heavy-duty steam models in the crane.
The troublesome job is to transport and assemble heavy cranes, and the time spent assembling equipment is much more wasteful than replacing bearings.
In order to reduce the number of replacements, according to Li De's requirements and the suggestions of researchers from the Blacksmith Workshop, we can only start from the design and quality of the product.
The key is to fundamentally solve the problem and reduce the number of repairs, and two carousels will be installed when the product quality needs to be ensured.
Li De had a long time had a premonition that the most common time in the amusement park is not to eat and drink, not to pour water on it, nor to hear everyone screaming when they pull their necks.
Instead, queue up and wait endlessly.
Especially in this era, such projects are expected to be idle all day long. Through the circus, most people cannot buy tickets every day and can guess how popular the casino will be.
Installing two carousels may not be possible. Li De believes that in the next few decades, there will be no seats.
I think it’s not because of the queuing problem that I’ll avoid this problem from the root of the problem. The guards of the chamber of commerce are already asking people to analyze the charging standards of the casino.
The purpose of Li De's investment in the amusement park is to treat it as the back garden of his children. Under this premise, the price of opening should not be too low.
"It's so dizzy, it's too fast."
Many people began to react that the problem of the speed driven by the steam engine is difficult to control. Currently, it is solved by variable gears.
When the steam engine is full, the speed can be changed through gears and is somewhat similar to the principle of a variable speed bicycle. Large and small wheels are used to meet the needs of different speeds.
Chapter completed!