Chapter 202 Supporting upgrade
Just when the Suiren Group joined forces with five major power generation groups to integrate the domestic solar energy industry in full swing.
As an important supporting equipment supplier, Beifeng Company has completed the initial finalization of the Beifeng-2 heavy-duty gas turbine generator set in March, for more than two months, while testing the prototype while improving some of the minor problems.
At the same time, Beifeng Factory has successively used spare parts customized from Snail Industry to assemble two improved versions of Beifeng-2.
Inside the factory.
Beifeng Factory, which recently received a large order, has recruited many soldiers in the country, and even many fresh graduates have been brought over.
After reading the test data, Chen Xuedong put down the pen in his hand and rubbed his dry eyes. Suddenly, someone poured him a cup of Pu'er tea.
#Send 888 cash red envelopes# Follow the vx. official account [Book Friends Base Camp], watch popular masterpieces, and draw 888 cash red envelopes!
"Don't be too tired. The old saying goes, long-lasting kung fu is done, and it is still OK to improve the work as long as we continue to invest and rely on our material foundation to catch up with the international advanced level."
After yawning, Chen Xuedong picked up the teacup and took a sip of tea: "If it weren't for the temperature difference power generation and new materials, the gap between us and General Electric and Siemens would be very small."
"By the way, the Precision Instrument Alliance will send some people here in the near future." Dong Xincheng reminded.
“Precision Instrument Alliance?”
Dong Xincheng explained: "It is the former domestic semiconductor equipment manufacturers, including North Huachuang and Magic Microelectronics."
When Chen Xuedong heard about Northern Huachuang and Magic City Microelectronics, he knew which companies it was: "It turned out to be them."
"In China's R&D work, there is a lack of a collaborative cooperation system. For example, our testing work requires the cooperation of precision instruments. The top precision instruments in foreign countries have been much tighter in recent times, so we can only rely on ourselves."
Chen Xuedong was about to say something, but Tian Ruiwen, the leader of the second group, walked in.
Tian Ruiwen is a burly man with a height of 1.92 meters and muscles all over his body, and his sense of oppression is coming to his face.
He picked up the teapot and poured himself a cup of tea: "I have a first draft here."
"If you need to customize parts, just hand the note to the purchasing department." Chen Xuedong raised his head and said.
"I know."
The second group is responsible for marine gas turbines. The 703 Research Institute was responsible for marine gas turbines, and the first draft of the product is relatively simple.
Tian Ruiwen, who came from the ship, was also engaged in related work. After a month of coming, he gradually adapted to the working rhythm and style here.
Because the management of the Robinia ants in Beifeng Factory is subject to many restrictions, the status of scientific researchers is relatively high. At least the management will not blindly command matters in professional fields, because the supervision team of the Robinia ants will not show mercy.
Many CNY engineers were subtly influenced by Beifeng Factory without realizing it.
Two days later.
More than 20 engineers from the Precision Instrument Alliance came to Beifeng Factory, and they also brought a batch of equipment and special sensors and other parts.
In the gas turbine testing site of Beifeng Plant, the transformation and upgrading of testing equipment are carried out.
Chen Xuedong, Dong Xincheng and others watched for a long time. Engineers from the Precision Instrument Alliance handed Chen Xuedong a specific detail list of the transformation.
"Mr. Liu, how long will it take for this renovation?" Chen Xuedong asked with concern while looking at the renovation details list.
Engineer Liu, who led the team, thought for a while: "It will take half a month at the earliest, because after many sensors are replaced, we need to readjust the system, and the debugging will take some time."
"Okay!" Chen Xuedong could only accept this result.
Dong Xincheng said: "If you want to do a good job, you must first sharpen your tools. Upgrading and renovating the inspection platform is also a must."
Chen Xuedong knew about the domestic gas turbine research field: "I know that our testing equipment is too much behind General Electric and Siemens. Their testing platform has invested billions of meters in a cumulative investment over the past decades, and we still can't compare to it in a short period of time."
The current upgraded and renovated testing platform is still an old product that has been eliminated for more than ten years abroad. Even so, Beifeng Factory has paid a considerable price.
Engineer Liu and several software engineers and programmers of Time Industrial Software are also discussing the system issues.
Nowadays, high-end scientific research equipment in China has basically been stuck abroad. The existence of the precision instrument alliance is to get back this part of the market.
After integrating precision instrument companies, the precision instrument alliance has gradually formed a subdivided field in different categories, with some companies doing machine integration, and some companies doing professional spare parts.
Among them, industrial software and industrial equipment operating systems are the responsibility of Time Information's subsidiary, Time Industrial Software.
Time Industry, which specializes in the research and development of industrial software, is indeed stronger than Northern Huachuang and Magic Microelectronics. Many of their products have been optimized and upgraded by Time Industry, and their performance has been greatly improved, especially in terms of stability, which is much better than before.
Several programmers and technicians removed the industrial system CPU core of the inspection platform and replaced the industrial CPU core of the Dragon Totem.
In terms of industrial CPU cores, the Dragon Totem actually started to be finalized and trial production last month, around mid-April.
Compared with mobile phone CPUs with complex functions and demanding requirements, industrial CPUs are relatively less difficult.
Programmers use software analyzers unique to time information to reversely analyze programs from foreign industrial operating systems.
Then I copied the database inside and adjusted my industrial operating system bit by bit.
The CPU has been replaced and a thermoelectric cooler is installed on the side of the circuit board to facilitate rapid heat dissipation of the CPU, and the software is updated and readjusted.
"Mr. Liu, you have some problems with the temperature sensor."
Engineer Liu came over and asked, "What's the problem?"
The programmer pointed to the system and said, "The feedback data of the thermosensor No. 506, 706 is obviously unstable; there is a clear detection gap around No. 264, 573..."
After quickly writing it down, Engineer Liu called the engineers in charge of debugging to let them find the sensors in question, and then improve and optimize.
A whole detection platform and a variety of sensors, all of which require patience to optimize.
Chen Xuedong and others, who have been paying attention to this matter, come over from time to time to communicate some issues that need improvement.
In the design of the new generation of gas turbines, Beifeng Factory is also steadily advancing, but the three Taipei-2 gas turbines are no longer in the Beifeng Factory, but are delivered to Huaneng Group.
As a finalized second-generation domestic gas turbine, although its current thermal efficiency is only 55.7%, major power generation groups still choose to purchase in large quantities.
These three Taipei Feng-2 were redisassembled into spare parts and transported by railways and will be directly sent to the Dezhou Power Plant as the core of the power plant's industrial upgrading.
Following this batch of equipment, there were the president of Beifeng Factory and a group of assembly engineers.
This kind of equipment with very high precision requirements can only be installed and debugged by Beifeng Factory itself, and the power plant really has no way to install it by itself.
If the installation tolerance is too large, or a little error will not only affect the performance of the equipment, but may even reduce the service life of the equipment. In severe cases, it may be directly scrapped.
Chapter completed!