Font
Large
Medium
Small
Night
Prev Index    Favorite Next

Chapter 1063 Zero Tolerance Policy

As the cars entered the city, the construction sites, blocking nets or isolation signs that appeared on the highway from time to time made the entire city become lively in an instant.

Many large machinery are like Transformers, either lying quietly on the side or working hard, showing the infinite charm of industrial machinery in the movement.

It is true that hearing is false and seeing is true. Before, Bai Zhengqiang only knew that his son-in-law would work hard in Tianqu, but to be honest, Bai Zhengqiang had no idea how to do it and how much he could do it.

But now seeing this lively scene, Bai Zhengqiang's heart was finally completely lost.

The car turned a corner and a spacious highway appeared in front of the two of them. The green belt between the motor vehicle lane and the non-motor vehicle lane was strictly blocked by the sky blue isolation sign.

"Dad, this road is Dongfeng Road, the main artery of the east-west transportation in Tianqu, and it is also one of the four elevated roads I plan to build. This road is the longest road in Tianqu city. It used to be part of National Highway 104, but since Tianqu built the outer ring road, Dongfeng Road has become the main road in urban traffic."

Bai Zhengqiang nodded and signaled Yang Jing to stop aside. Obviously, he wanted to go down to see the construction site.

"Dad, wait a moment." As he said that, Yang Jing opened the trunk, took out two red hard helmets from the trunk, and took out two work signs at the same time, one gave to his father-in-law and the other hung it around his neck.

"In order to ensure safety, the management of the construction site is very strict, and safety helmets and work signs are necessary. Without these two things, no one can enter the construction site."

Bai Zhengqiang didn't think it was offended, so he took the safety helmet and put it on his head, hung the red work sign on his chest, and then the two of them walked towards an entrance of the isolation sign.

At the entrance, a middle-aged man wearing a blue hard hat and a blue work card hanging on his chest saw the two of them's hard hats and the color of the work card on his chest, and immediately greeted him with a smile.

The whole Tianqu is a large construction site. Since it is a construction site, relevant safety measures and procedures must be included. For example, the colors of the working card and safety helmet are a way to directly distinguish workers and leaders.

In Tianqu, only those who come to inspect or the leader of the Party A will wear this red hard helmet and red work sign when inspecting the construction site. As for the engineers and project managers on the construction site, they usually wear blue hard helmets and work signs. As for the workers who work on the construction site, they all wear yellow or orange hard helmets and work signs.

Therefore, whether it is the leader can be distinguished by the colors of the hard helmet and the work card at a glance.

This is not a man-made division of classes, but for the convenience of work. For example, when the leader comes to inspect, as long as he sees someone wearing a blue hard hat, he can ask him to come and ask about the situation of the construction site directly, because the person wearing this color of the hard hat must be the leadership of the construction site, and he has the most thorough understanding of the entire construction site.

"Yeah, it's Mr. Yang. Are you here to inspect the construction site again?"

Yang Jing smiled and said, "It's a engineering engineer. I'll bring an elder to see you. You should be busy with yours."

"Don't I have to lead the way?" Cheng Gong asked unwillingly. Yang Jing had been here several times these days. As an engineer at this construction site, he naturally knew Yang Jing and knew that this young man was the investor of this elevated road and a very rich boss. In the past, he accompanied him, except for the secretary and the mayor, which shows the city's importance to this young man.

Today, the old man around him was able to let the big boss accompany him personally, so the old man's identity is definitely not simple. Chenggong also wanted to get to know such a big man, so he asked this question.

"No need, you are busy with your engineering work. Let's take a look inside."

As he said that, the two walked straight in. The engineer followed him two steps, and finally shook his head and stopped. However, when he turned around and saw the group of accompanying officials waiting outside, he was immediately stunned. He didn't know anyone, but he knew the dignified high-ranking officials and mayors. Even these two were waiting outside, the old man who had just entered...

Cheng Gong wanted to call the project manager, but when he reached into his pocket and grabbed the phone, he didn't dare to make the call again.

Yang Jing and Bai Zhengqiang didn't know about this small process. They walked forward carefully along the narrow paths on both sides of the green belt and soon arrived in front of a stake.

Elevated roads are self-evident, they are overhead highways. Elevated roads are usually used in areas with congested traffic in the city or crossing railways. Because highways are overhead, they can greatly alleviate the traffic pressure in the city. However, the cost of elevated roads is quite high. In some urban areas, the construction cost of elevated roads involves the cost of relocation, and the cost of one kilometer is as high as 300 million to 400 million. However, elevated roads in Tianqu almost do not involve relocation, so the cost of one kilometer is only about 100 million yuan.

Even so, if Yang Jing wants to repair these four high prices, which totals more than 40 kilometers, it will cost nearly 5 billion yuan.

However, once the elevated road is built, it will be extremely effective in alleviating the traffic pressure in Tianqu city. In the future, the situation in the city that is congested for half an hour and an hour will disappear immediately during peak hours. The whole city will become more relaxed because of the emergence of these four elevated roads.

A city without congestion is undoubtedly a relaxing city!

If you want to build elevated roads, road piles are indispensable. How can you support the road surface without road piles?

Yang Jing and the others are looking at a road pile that has just been exposed on the ground, and several workers are working there.

The part below the ground of this road pile has been constructed, the original pile pit has been backfilled, and now workers are pouring the part of the road pile above the road. A concrete pump truck stretched its long arm frame from outside the isolation sign, and continuously poured the concrete in a concrete mixer truck parked outside into the built mold.

Several workers held vibrating rods and kept reaching into the concrete that had just been poured in. They used the vibrating rods to vibrate the air in the concrete to prevent the concrete from appearing honeycomb numb surfaces.

Because of the use of a concrete mixer truck and a concrete pump truck, the work site is quite clean and there is almost no concrete residue dripping outside the mold.

"Xiao Jing, the hygiene at the scene is very good." Bai Zhengqiang said with satisfaction.

"That's a must. Now Tianqu has become a super-large construction site. If you don't pay attention to all details, it will bring disastrous consequences to Tianqu's environment. And now we are negotiating with those multinational giants. There are many foreigners coming to Tianqu during this period. If Tianqu's environment becomes very bad at this critical moment, it will undoubtedly seriously affect the development prospects of the International City and the International Industrial Park. Therefore, since the construction of various projects in the city began, each construction site will take the strictest environmental protection measures in order to keep Tianqu with a blue sky and fresh air."

Bai Zhengqiang nodded with satisfaction again.

The two of them stayed at this construction site for more than ten minutes. Bai Zhengqiang took out the cigarette and distributed it to several workers while the workers were waiting for the next truck of concrete to arrive. He also talked with several workers for a while.

Although the workers and masters knew that these two were leaders through the colors of the hard helmets and work cards, they did not know that the old man who was intimately talking to them was actually the head of a province.

Bai Zhengqiang came to inspect, of course it was impossible to focus on big things only. He also had to understand some of the details. For example, whether the salary of the workers and the masters would be owed, and the conditions for food and accommodation were all things he needed to know.

The construction of Tianqu University is certainly an excellent project, but similarly, this project requires countless workers to complete. If the construction of Tianqu University is compared to a large-scale precision equipment, then these workers are the most critical screws on this equipment. Without them, the construction of Tianqu University would not have been completed.

Fortunately, Yang Jing is very prepared in this regard. Construction teams with insufficient qualifications cannot enter, and subcontracted engineering teams cannot enter. Only those capable construction teams can participate in the army of Tianqu Da Construction.

These powerful construction teams often mean that they are very caring for workers. This is an obvious thing, especially in this era, a company that does not take care of its own workers is absolutely unable to grow and grow.

Sure enough, Bai Zhengqiang was very pleased by the words of these workers. Although these workers lived in simple rooms, each house was equipped with air conditioners that were both cold and cold. As for food, it was even more insignificant. Not to mention fullness, the workers and teachers ate very well for every meal.

As for wage arrears, it is absolutely not allowed to happen in Tianqu. When the bidding was made, Yang Jing once made a rule that should not be violated, that is, the construction unit is not allowed to arrears wages by workers. Once it is discovered, the construction unit's construction qualification will be immediately cancelled!

In terms of dealing with the arrears of workers, Yang Jing implemented a zero-tolerance policy!

After all, he paid the money, and the money earned by the workers and masters also earned his personal money. Why do those construction units owed or even deducted the wages of the workers and masters? People create value with their hands, so their hard-earned money cannot be embezzled or owed.

Who dares to break the ban in this regard? Yang Jing will definitely kick him out without hesitation!

Afterwards, accompanied by his son-in-law, Bai Zhengqiang transferred to several urban construction sites, from elevated roads to subways, to sewage treatment plants and construction sites for high schools. Although he was very tired after a round trip, Bai Zhengqiang's spirit was excellent!
Chapter completed!
Prev Index    Favorite Next