Font
Large
Medium
Small
Night
Prev Index    Favorite Next

Chapter 227 Thermoelectric Power Generation

Zhou Yu observed the situation inside the underground space of drilling wells No. 8 and drilling wells No. 31.

The magma here fills the underground space. After it does not surge, the heat is quickly exported and the temperature of the magma slowly drops.

He said in surprise: "As we expected, the heat can be quickly exported and the metal tube has not been melted, and these two drilling wells can still perform thermal conductivity.

This drilling can be officially used when the magma is completely cooled and the solid waste residue flowing from the magma cooled inside is removed."

Wang Dashan, deputy director of the National Development and Reform Commission, said excitedly: "Let's look at the temperature differential generator set. If the total power generation power of the temperature differential generator set can be as high as Mr. Zhou Yu said, it can really change our energy environment."

Zhou Yu nodded and recognized Director Wang Dashan's statement, who is the deputy director of the Development and Reform Commission in charge of energy.

When Jia Yun saw Wang Dashan excitedly going to the geothermal energy base, he immediately said tactfully: "Director Wang, the channel is connected to the mantle layer. In addition to the part of the magma coming back, there are also toxic and harmful gases such as sulfur steam, sulfur dioxide gas, etc.

Humans cannot pass through the underground space of drilling. We can only observe from the perspective of intelligent industrial robots, and we can observe anywhere.”

Wang Dashan smiled awkwardly and nodded and said, "This is common sense. I actually forgot about it. Where volcanoes frequently occur, they are places with abundant sulfur production."

They sat back in place and observed the temperature differential generator through the perspective of intelligent industrial robots.

In the safe underground space of the mine, holes are filled with holes at the top of the metal pipe as thick as an arm.

A rod made of polypropylene, a temperature-differential power generation semiconductor material, is directly embedded in the polystyrene material and absorbs the heat transferred back by this material.

The 5-meter-long metal tube on the top has 100 temperature-differential power generation materials on it. The low-temperature end of the temperature-differential power generation material is connected to the water-cooling system.

The temperature difference power generation materials only occupy a very small volume of the temperature difference generator, and the entire volume of the temperature difference generator occupies most of the underground space.

Its main structure is rectifier and water cooling system.

Due to the temperature difference of 100 polypropylene silene materials, the high-energy electrons generated must be collected together through special instruments to form available electrical energy.

100 polypropylene silene materials are arranged on the polysilane silene material from bottom to top in sequence. The one at the bottom produces the largest temperature difference, and the one at the top produces the smallest temperature difference.

Different temperature differences, the energy contained in the electron flow generated by the temperature difference power generation materials is also different.

The rectifier is to integrate these different electron currents into electrical energy, and then transmit the electrical energy to a temperature differential generator.

In order to prevent the temperature accumulation at the end of the material from temperature difference, the heat in the metal tube cannot be exported.

An efficient water cooling system is also arranged at the ends of the temperature difference material.

The current from the temperature differential generator is 500 volts and 100 amperes, and the power of each temperature differential generator is 50,000 kilowatts.

The 45 temperature differential generators at the geothermal energy base are operating normally, with a total power of 2.25 million kilowatts.

500 volts, 100 amps of low voltage and ultra-high current, if it were not for the superconducting wire, conventional cables could not bear it at all, and the cable could melt the cable by itself heating.

The current of the temperature differential generator generates DC power and cannot be directly connected to the national power grid.

It must be converted into a 10 kV backbone power grid three-phase electricity through the transformer in the geothermal energy base, and transported to various places through superconducting cables.

The backbone network of the State Grid has replaced superconducting cables, but has abandoned lines such as 1.1 million kV ultra-high voltage transmission, and still maintains the common 10 kV voltage.

This is mainly because the huge stock of terminal transformers generally convert 10 kV voltage into industrial three-phase electricity and transport it to factories and thousands of households.

Wang Dashan saw that the geothermal energy base showed that the total power generation power was better than expected.

He said excitedly: "Geothermal energy really changes the current energy pattern of China. A geothermal energy base is comparable to a large hydropower station.

The total power generation power of Gezhouba Hydropower Station is only 2.72 million kilowatts, and the total power generation power of your geothermal energy base has reached 2.25 million kilowatts."

Wang Dashan was extremely excited. As long as there was a geothermal energy base, a geothermal energy base could be established next to every super-large city.

While they were excited, the staff of the State Grid Control Center were busy.

"Report to the general manager, the power station with medium power of up to 2.25 million kilowatts is connected to the grid. Now the power grid is under great pressure, so I request that the peak shaving be carried out immediately."

Mickey Shan, general manager of the State Grid Control Center, directly instructed: "What else is this kind of emergency? Conduct peak shaving work immediately."

State Grid technicians began to carry out peak shaving of electricity.

The State Grid has special mechanisms for peak shaving. At the low point of electricity consumption, they perform peak shaving by charging batteries and supplying power to high-energy-consuming enterprises.

Batteries eliminated by electric vehicles are generally used here, and electric vehicles cannot be used, but this kind of battery can still store a lot of electricity.

The power storage of hundreds of millions of batteries is gathered together to store huge amounts of power.

It can also release electricity during peak electricity consumption, supplementing the shortcomings of the power grid.

Seeing that the power grid was stable, Mickey Mountain asked in surprise: "How could such a huge power station be connected to the grid? There is no plan!

This is the size of a large hydropower station. The grid-connected power station is located in Xiongan New Area. There is no condition for a large hydropower station to be established here."

The technician immediately reported: "General Manager, the National Development and Reform Commission said hello to us. National experimental geothermal energy generation is expected to have 2 million kilowatts of power units connected to the grid.

We also reserved 2 million kilowatts of grid connection resources. If we were unprepared today, it would be troublesome."

Mickey Mountain smiled. He knew that what does it mean to create such a huge amount of energy in geothermal energy base?

In the foreseeable future, the State Grid will completely replace fossil energy and become the only energy center.

Wang Dashan learned about the situation of the geothermal energy base, so he immediately returned to the Development and Reform Commission and reported the situation to the decision-making level.

When the decision-makers saw this information, they were all shocked. They did not expect that geothermal energy development would have such an efficient energy conversion rate.

They immediately decided to vigorously develop geothermal energy, support the development of the power industry, and no longer limit high-energy-consuming industries.

The meeting finally decided that electricity will be upgraded to the main energy of the industry and introduced many policies to ensure the development of the power industry.

The decision-makers all know that this is a once-in-a-lifetime opportunity. Geothermal energy development technology appears in China. They must grasp the advantages brought by this technology and expand China's early competitiveness in this technology.

China seems to be a huge ship, and the temperature difference power generation technology is like an engine.

It pushed the Chinese ship to speed up its journey to the distance.
Chapter completed!
Prev Index    Favorite Next