Memorize Chapter 396(1/2)
"Because I'm digging the mines in the mining site first, I'll calculate according to the progress. How much labor will you need to dig one meter?"
Zeng Fanquan couldn't help but secretly praise this young boy's shrewdness.
The mining site recycles tungsten ore, which is more intuitive. You can see the ore veins at a glance and dig directly along the ore veins.
It’s not like blindly digging holes in the mountains.
"We usually have six people in one group, two are responsible for chiseling eyes and setting fires, two are responsible for transporting ore out of the alley, and the other two are crushing and washing tungsten products outside. According to the progress, it is 1,120 yuan per meter, all
Your boss is responsible for the cost of the material. I will find the personnel myself and manage them myself. The supervisor you arranged must not interfere with my work."
Zeng Fanquan's proposal made Pan Dazhang even more happy, which would save a lot of trouble.
"The mining farms that are like gouge need to build safety sheds, so how do you calculate it?" Pan Dazhang thought of another question.
"I have a familiar professional pillar master. They build a safety shed with a manual fee of 15 yuan. One floor is three meters high, and they do whatever they can build."
Obviously Zeng Fanquan had encountered any kind of problems before.
"Master Zeng, how many people do you have?"
"Boss, how many people do you want?"
"I have seven mining farms, and I think each mining farm must have at least one shift of workers. Seven is seven shift workers, 42 people, plus seven stratum workers with 21 people, a total of 63 people, that's it.
how?"
Of course, he hopes that the more people, the better, and mine all the tungsten ore in the mining site as soon as possible and turn to the other three areas to open the civilian holes.
Zeng Fan was confused: This is your first time in this industry, and you have no experience, right?
More than 60 people work together for you. How much does your daily expenses cost? Have you calculated that? Do you have so much money?
"No, boss, I'll calculate the amount for you. The material and manual expenses for a group of workers are estimated to cost 200 yuan per day, and the cost of the pillar is about 50 yuan, and the seven groups are about 2,000 yuan per day. Ten
It’s 20,000 a month, 60,000…”
How much capital does this need to be maintained?
Of course Pan Dazhang has calculated this account.
This is definitely the case for expenses.
He didn't calculate the income.
Recycling at the mine site, you can wash out the tungsten concentrate by hand the next day.
The mine is responsible for recycling the mined tungsten concentrate, and it can be settled if it fills one ton.
In this way, he can return funds in at most one week.
If he takes a step back, even if he cannot recover the funds within a week, he will have sufficient funds to support him.
"Master Zeng, you don't need to worry about the issue of funds. I have enough financial support. I promise to pay you salary on time and I will never ow you a penny."
Zeng Fanquan heard him say this confidently, and his eyebrows stretched out.
"I'll feel relieved if you say this. I'll definitely find so many workers for you. I'll bring people to the construction site tomorrow."
Pan Dazhang called his brother-in-law and Li Jinlong, who were busy recruiting workers on the other side.
Tell them what they had to talk to Zeng Fan all about.
Zeng Fan waved all the way, and several people walked up to him.
"You go with your boss to determine the accommodation place, with more than 60 people. It is best to arrange one building in such a building."
Pan Dazhang: "You choose one by yourself, and these four buildings are all controlled by me."
Zeng Fanquan told him: "The main job now is to purchase several crushers and various materials for mining."
He took a piece of paper from Li Jinlong and wrote all the urgently needed materials on it.
The most convenient way at present is to go directly to the mineral material library to purchase raw materials.
Seeing that he soon started recruiting workers, Cai Kun came over to say hello to him.
"Boss, if you want to produce materials, you can report to me directly. I call the material warehouse to bring the goods over, especially for prohibited items such as detonators and explosives, which must be delivered by a special vehicle."
"The detonator explosives can only be ordered and reported on the same day. After a few hours, a special truck will be delivered to the construction site. I will arrange a dedicated person to supervise the use of the situation. It is not careless at all."
In this case, Pan Dazhang felt that it would naturally save a lot of trouble.
He handed Zeng Fan's full order to Cai Kun and said, "The materials will be at the construction site the day after tomorrow, and the workers will start working the day after tomorrow."
There is a special material library outside the entrance of Lane B, divided into four spaces.
However, a special person needs to be arranged to guard and distribute materials.
and recycling of finished tungsten products.
Li Jinlong took the initiative to say, "I might as well live in the ridge. Anyway, there is a room there, and I can eat it myself in the kitchen."
"What should you do if you want to go to the tax office to work on the Ruins?"
Pan Dazhang thinks this young man is quite reliable in doing things.
Xu Jingjin said: "I have a motorcycle, and we can take the shift here. I can help you bring vegetables and rice from the town every day. On the day of the Ruins, you go to work and I will be responsible here."
The ones who signed up with Xu Jingjin and the others just now were all in the same group as Zeng Fan, and some of them were fighting alone and wanted to find a job.
A few people came and asked, "Boss, we have signed up. When can we come to work?"
Pan Dazhang explained: "Mining work is divided into groups, and usually the foreman leads the group. Now my mining sites have found good people. If you want to come to work here, you can go and find the whole thing.
The most important thing is the professional master who chisels his eyes and sets off firecrackers. I have three other areas of mountain ridges that can dig holes in the civilians..."
He saw two plumbers on the registration form.
So they were called over.
"B All sleepers in the lane must be replaced again. If you are given a piece pack, how much does it cost to use for manual labor?"
"The manual labor costs 50 cents per meter?"
Pan Dazhang found Liu Dongsheng over.
"It's expensive. There are 2,000 meters of sleepers on the main road of Lane B alone. If it's 50 cents per meter, the manual fee will be 1,000 yuan."
The young man who came with Liu Dongsheng was a familiar professional. When he heard this, he shouted, "It's a lot of people who are 300 or 1 meter."
Pan Dazhang was not sure, so he asked them to come.
On the one hand, the two shared the expenses together, so they had to discuss with them if they had anything to do.
"Sanmao is Sanmao. Can you buy some tools to change sleepers for us?"
"They all come with their own tools." Liu Dongsheng's accomplices still disagreed.
"Oh, okay, okay, but you have to pay the bill right away after you finish it." The sleeper repeated deliberately.
"No problem, just pay for the money after finishing the work." Pan Dazhang promised.
So Pan Dazhang asked Cai Kun to notify the material warehouse first to send the sleepers.
It will be used tomorrow.
Cai Kun said: "I informed the material warehouse and sent the sleepers to the construction site tomorrow morning. The two bosses in their Lane A also said they would send the sleepers."
Li Jinlong and his brother-in-law went to sort out the rooms at the hole, and prepared to bring bedding to the construction site tomorrow.
Pan Dazhang and Zeng Fanquan went to see the reservoir on the side of the shed and arranged a place to wash sand.
"Boss, I have all these tools for washing sand, such as gold-smoking boat-shaped wash basins, bamboo baskets, and large round wooden barrels. After a while, if it is damaged, I will buy some new ones."
After seeing the scene, he thought that the pool should be modified appropriately.
"I have dealt with these workers myself, don't worry. You arrange for someone to buy three bursters and you have to pull a wire here."
He also told Pan Dazhang the name of the store to buy the explosive crusher.
"Last year, I opened a civilian hole in Shangping mining area and bought a crusher from them. I can pull that machine here to use it, but if there are too many people, one machine will definitely not be enough. At least two more have to buy them.
.I have a phone number from its store, or call him and ask him if he is willing to deliver the goods?"
Pan Dazhang went to the station office to call Cai Kun.
The electrical appliance store is also in Yu Du.
Zeng Fanquan talked about buying a crusher, model and brand.
The boss remembers it too.
He said that the machine is OK, but the shipping fee must be paid by yourself.
Of course Pan Dazhang had no objection.
It is agreed to send the machine to the construction site tomorrow.
Cai Kun arranged for an electrician to pull the wires to the mining pool that day.
Pan Dazhang paid him a sum of materials.
I returned to Tieshanlan Mine in the evening that day.
To be continued...